Senior Construction Scheduler Construction, Mining & Trades - Irvine, CA at Geebo

Senior Construction Scheduler

Job DetailsJob LocationLAOC Office - Irvine, CACollaborative people.
Progressive builders.
Consistently recognized as a best workplace, and for our commitment to safety, sustainability, and community partnerships, BNBuilders hires the very best in the construction industry and strives to create an environment that encourages innovation, responsibility, and client satisfaction.
If you are looking to be a part of an open, supportive team and receive exciting challenges that promote personal and professional growth, look no further than BNBuilders!JOB
Summary:
The Senior Construction Scheduler will support planning and scheduling activities for construction projects through application of diversified controls, systems, principles, and practices.
SALARY RANGE:
$140,000 - $149,000 company wide
Benefits:
Group medical, vision and dental insurance including choice of two benefit plans - a PPO plan and a high deductible / Health Saving Account Plan with company contribution to HSA.
Company-paid Short- & Long-Term Disability plans, group Life Insurance, and AD&D plans Flexible Spending Account (FSA) plans (for health care and dependent care) Untracked / Unmeasured vacation.
Sick Leave accrued at 1 hour of sick leave for every 30 hours worked with a carryover of 80 hours 9 paid Holidays each year Paid Parental Leave Annual Discretionary Bonus based on company profitability and your manager's assessment of your performance.
Company vehicle or vehicle allowance, toll pass and fuel card A 401(k) savings plan under which BNB matches the first three percent of your deferral with a 100% match and the next two percent with a 50% match for a total matching contribution of 4% of your pay.
You are immediately 100% vested in all contributions (including BNB match).
We provide both traditional (Pre-Tax) and Roth (post -tax) contribution options in our 401(k) plan.
We're also proud to be an employee-owned company.
This means you get an ownership stake in BNB through a benefit called an Employee Stock Ownership Plan (ESOP).
It's 100% company funded and is invested in BNBuilders stock.
You can participate in this long-term plan after you complete 1 year of service (with at least 1,000 hours).
JOB
Responsibilities:
Exercise general supervision of multiple job sites to monitor and manage projects during each phase of construction; including but not limited to pre-construction, construction, closeout, and post-construction.
Understand and implement accepted planning and scheduling best practices.
Plan and coordinate scheduling activities of a project.
Work closely with Superintendents, Project Managers, and other team members to develop and maintain schedules in all phases of a project.
Provide training on P6 and scheduling techniques.
Analyze drawings, specifications, and contracts in the preparation and acceptance of usable baseline schedules for construction.
Support the development of bid and proposal schedules with Executive management.
Utilize analytics to identify and report on project trends.
Effectively cost and manpower load schedules for use during the execution of the project.
Evaluate the actual construction status relative to proposed plan.
Analyze and communicate the impact of changes to the schedule.
Prepare Time Impact Analyses per recommended practices by commonly accepted standards.
Other duties as assigned.
Qualifications:
Undergraduate degree in Engineering, Architecture, Construction Management, or a related discipline.
5
years scheduling experience on commercial construction projects.
Proven success implementing strategic initiatives.
Advanced proficiency in Primavera P6 software.
Detail-oriented and can manage priorities in a fast-paced environment with minimal guidance.
Skilled at developing and maintaining relationships with owners, subcontractors, senior leaders, and project teams.
High degree of initiative, personal responsibility, and integrity.
PHYSICAL DEMANDS:
The physical demands described here are representative of those that must be met by an employee to successfully perform the essential functions of this job.
Reasonable accommodations may be made to enable individuals with disabilities to perform the essential functions.
Capable of traversing over construction-type terrain when under development; moving through the construction site and the materials in place for use on the site; climbing ladders and temporary stairways; conducting visual inspections of quality of construction and materials being used in construction.
Conduct jobsite walks to ensure successful project completion.
Conduct jobsite walks to identify and eliminate safety hazards.
WORK ENVIRONMENT:
The work environment characteristics described here are representative of those an employee encounters while performing the essential functions of this job.
Reasonable accommodations may be made to enable individuals with disabilities to perform the essential functions.
BNB believes in collaboration, team building, and a strong supervisor/employee relationship.
To accomplish this, the duties of this role are not performed in a remote capacity, and we expect that all employees will complete work in an office/job site setting.
While performing the duties of this job, the employee is frequently exposed to fumes or airborne particles, moving mechanical parts and vibration.
The employee is occasionally exposed to a variety of extreme conditions at the job site.
The noise level in the work environment and job site can be loud.
This position is performed in outside weather conditions.
Our Commitment to Diversity and InclusionAt BNB, diversity, equity, and inclusion are the driving forces in which our culture is built.
We recognize that our unique and vast differences bring a richness to our lives and work environment.
This fosters stronger and more meaningful relationships within our company and the communities in which we serve.
Our mission is to strive to provide an environment that is respectful, safe, fair, and inclusive, so that we can be stronger, wiser, and better together.
Note:
BNBuilders retains the discretion to add to or change the details of this posting at any time.
Recommended Skills Architecture Attention To Detail Construction Construction Management Data Analysis Strategic Thinking Estimated Salary: $20 to $28 per hour based on qualifications.

Don't Be a Victim of Fraud

  • Electronic Scams
  • Home-based jobs
  • Fake Rentals
  • Bad Buyers
  • Non-Existent Merchandise
  • Secondhand Items
  • More...

Don't Be Fooled

The fraudster will send a check to the victim who has accepted a job. The check can be for multiple reasons such as signing bonus, supplies, etc. The victim will be instructed to deposit the check and use the money for any of these reasons and then instructed to send the remaining funds to the fraudster. The check will bounce and the victim is left responsible.